Chiffa Algeria 240 Social Residence Construction Project (Ongoing project)
Feb,24 2012Name Chiffa Algeria 240 Social Residence Construction Project Client OBGI Blida
-
Design and Execution of the Farms of Harawa and Wadi Al Ahmar (Ongoing project)
Feb,24 2012Name Design and Execution of the Farms of Harawa and Wadi Al Ahmar Client Great Socialist P...
-
Uğurlu Hydroelectric Power Plant (Ongoing project)
Feb,24 2012Client Teksu Energy Location Ordu-Golkoy Installed Capacity (MW) 8.78 MW Total Ene...
-
Karakuş Hydroelectric Power Plant (Ongoing project)
Feb,24 2012Client Nisan Energy Location Tokat - Niksar Installed Capacity (MW) 4.72 MW Total ...
-
Umut II Hydroelectric Power Plant (Ongoing project)
Feb,24 2012Client Nisan Energy Location Ordu - Akkus / Tokat-Nikar Installed Capacity (MW) 22....
-
Doğançay Hydroelectric Power Plant (Ongoing project)
Feb,24 2012Client Enerjisa Location Adana-Aladağ Installed Capacity (MW) 61.95 MW Total Ener...
-
Erzurum Sakalıkesik Plain İrrigation Construction (Ongoing project)
Feb,24 2012Client D.S.İ. (State Hydraulic Works) Location Erzurum Irrigation Area 11480 ha. ...
-
Tahirova Plain Irrigation Construction (Ongoing project)
Feb,04 2012Client DSI Irrigation Area 4,890.00 ha Irrigation Canals 26 km Irrigation Pipes ...
-
Construction of Umut 1 Dam and HEPP (Ongoing project)
Feb,04 2012Client Nisan Energy Location Ordu-Akkus / Tokat-Niksar Installed Capacity (MW) 5.80 M...
-
Yaprak 1 Dam and HEPP (Ongoing project)
Feb,04 2012Client Nisan Energy Location Amasya - Tasova Installed Capacity (MW) 13.48 MW Tota...
-
Melen System Contract No:6 Pipeline (Ongoing project)
Feb,04 2012Client General Direktorate of State Hydraulic Works Joint Venture ATAÇ %50 - ALKE %50 C...
-
Gönen Plain Irrigation
Feb,04 2012Client General Direktorate of State Hydraulic Works Irrigated Area 11975ha Regulator ...
-
Construction of Ödemiş Potable Water Treatment Plant
Feb,04 2012Client Municipality of Ödemiş General Specification of Units Cascade Aeration Chamber, Cl...
-
Construction of Ödemiş Waste Water Treatment Plant
Feb,04 2012Client Municipality of Ödemiş General Specification of Unit Inlet&By-Pass Chamber, Co...
-
Construction of Gebze WWTP
Feb,04 2012Client Municipality of Gebze General Specification of Units 2 aeration ponds, 8 final sedim...
-
Melen System Contract No:7 Tunnels
Feb,04 2012Client General Directorate of State Hydraulic Works Joint Venture ATAÇ - ALKE J.V. Derb...
-
Construction of Başak Diversion Weir and HEPP
Feb,04 2012Client Nisan Elektromekanik Enerji ve San. Tic. A.Ş. Height of Dam 16,25 m Total Length...
-
Aydın Plain Irrigation Completion
Feb,04 2012Client General Direktorate of State Hydraulic Works Irrigation Area 26.000ha Concrete Li...
-
Upgrading of İzmir Commuter Line System 5th Stage
Feb,04 2012Client İzmir Big City Municipality Dept. of Coordination Rail System Directorate Task In Tend...
-
İzmir Şirinyer Station and Tunnel Construction
Feb,04 2012Client İzmir Big City Municipality Dept. of Coordination Rail System Directorate Şirinyer Un...
-
The Melen System Contract No:3 Pipeline
Feb,04 2012Client DSİ General Directorate DSI XIV th. Regional Directorate İstanbul Contractor ATAÇ...
-
Aydın Plain Irrigation
Feb,04 2012Client General Direktorate of State Hydraulic Works Irrigated Area 13445ha Gravity+7475ha. ...
-
Ataç Portakal Çiçeği Residence Construction Ankara
Feb,04 2012Client Hikmet ATAMAN - Hüseyin ÇALIK Construction Area 6435m2, 11 un apqrtment, 5 un Offi...
-
SS Yeşilçevre Wastewater Treatment Plant
Feb,04 2012Client SS Yeşilçevre Scope of work Civil works, local equipment and material supply, erec...
-
Niğde University Accomplishment Construction
Feb,04 2012Client Niğde University Monument 1 un Monument Area 20.000 m2 Ceremony and Walkin...
-
Anteks 3 Spinning Mill
Feb,04 2012Client Anteks Factory Building 14.000m2 Steel Roof Construction Ware Houses 2.000m2 ...
-
İzmir Atatürk Organized Industry Region Natural Gas and Portable Water Distribution Lines Project
Feb,04 2012Client İzmir Atatürk Organized Industry Region Details of pipe-work within the contract: ...
-
Five Star Kemer Resort Hotel Construction
Feb,04 2012Client Ataç Turizm A.Ş. Total Construction 53.000 m2 Total Number of Rooms 387 7...
-
Balıkesir Portable Water Treatment Plant and Pumping Stations
Feb,04 2012Client General Direktorate of State Hydraulic Works Scope of work Civil works, local equipm...
-
Bursa Wastewater Treatment Plants
Feb,04 2012Client Bursa Water and Sewerage Administration (BUSKİ) Eastern Waste Water Treatment Plant ...
-
Adapazarı Natural Gas Distribution Pipeline Project
Feb,04 2012Client Petroleum Pipeline Corporation (BOTAS) Details of the contract 16" Steel pipe: 1600m...
-
Eşen 2nd Dam & Hydroelectric Power Plant
Feb,04 2012Client Göltaş Enerji Co. Inc. Partnership Ataç %50, Alke %50 Concrete Gravity Dam ...
-
Kayaş-Bayındır Dam Portable Water Treatment Plant
Feb,04 2012Scope of work Civil works, local equipment and material supply, erection of all the equipment, er...
-
Pursaklar Portable Water Traetment Plant
Feb,04 2012Scope of work Civil works, local equipment and material supply, erection of all the equipment, er...
-
Antalya Portable Water Construction of Duraliler Pumping Station Task 15
Feb,04 2012Client ASAT Pomp Station 13.000 L/min Water Tank 12.000 ton Deep Well Drilling ...
-
Antalya Portable Water Distribution System Task 12
Feb,04 2012Client Asat 200.366 metres pipelaying (PVC,DI,Steel) 165.000 sq. meter asphalt renovation, ...
-
Suat Uğurlu 2.Hydro Electric Power Plant
Feb,04 2012Client Turkish Electromechanic Industry Co. Inc. (TEMSAN) Power Plant 23.5 mw Tunnel ...
-
Antalya Aksu Right Bank Irrigation
Feb,04 2012Client General Directorate of State Hydraulic Works Concrete Lined Primary Canal 34 km ...
-
Boyabat Dam Diversion Tunnels
Feb,04 2012Client General Direktorate of State Hydraulic Works Diversion Tunnels 2 units 8,5m inner di...
-
Eber Akşehir Plain Irrigation
Feb,04 2012Client General Direktorate of State Hydraulic Works Scope of work Construction of diversion...
-
Bursa Portable Water Treatment Plant
Feb,04 2012Client General Direktorate of State Hydraulic Works Pilot Company Ataç Construction and In...
-
Gezende Dam & Hydro Electric Power Plant
Feb,04 2012Client General Direktorate of State Hydraulic Works Installed Capacity 3x54.2 mw Tunnel ...
-
Manyas Lake Dikes
Feb,04 2012Client General Direktorate of State Hydraulic Works Dike Lenght 51.9 km Regulator Len...
-
Anteks Weaving and Finishing Mill
Feb,04 2012Client Anteks Factory Building 47 000 m2 Ware Houses 11.000 m2 Enterier Roads and ...
-
Aydın Airport Construction
Feb,04 2012Client Aydın City Council
-
Anteks Spinning Mill
Feb,04 2012Client Hikmet Ataman ve Ort. Koll. Şti. Factory Building 35 000m2 Steel Roof Construction ...
-
Bor Sugar Factory Construction
Feb,04 2012Client Sugar Factories A.Ş. Turkey Factory Buildings 50 000 sq.m Storage Buildings 1...
-
Khan Hotel
Feb,04 2012Client Kışlahan Turizm A.Ş. Shopping Hall 9.000 m2 Garage 1.500 m2 Otel Includi...
-
Berdan Dam Construction and Installations
Feb,04 2012Client General Direktorate of State Hydraulic Works Type of Dam Clayey core, soil-rock fill...
-
Berdan Dam Second Stage Irrigation
Feb,04 2012Client General Direktorate of State Hydraulic Works Excavation 1.870.000 m3 Concrete Wor...
-
Irrigation of 2nd Section of Right Bank Cevdetiye Plain and Drainage
Feb,04 2012Client General Direktorate of State Hydraulic Works Irrigation Area 23 000 ha. Concrete ...
-
Irrigation of 2nd Section of Left Bank Cevdetiye Plain and Drainage
Feb,04 2012Client General Direktorate of State Hydraulic Works Concrete Lined Primary Canal 60 km C...
-
Antalya Korkuteli Second Stage Irrigation
Feb,04 2012Client General Directorate of State Hydraulic Works Concrete Lined Primary Canal 28 km ...
-
Oymapinar Dam Main Service Roads, Dwelling Service Roads and Diversion Tunnel
Feb,04 2012Client General Directorate of State Hydraulic Works Diversion Tunnel 500 m Road Tunnel ...
-
Antbirlik Spinning Mill
Feb,04 2012Client Cooperative Union of Antalya Cotton Marketing Main Factory Building 50 000 sq.m a...
-
Maraş Narlı Türkoğlu Dehliz Right Bank Irrigation
Feb,04 2012Client General Direktorate of State Hydraulic Works Concrete Lined Primary Canal 40 km C...
-
Construction of Regional Boarding School Maraş
Feb,04 2012Client M.E.B
-
Malatya Akçadağ Fourth Stage Irrigation
Feb,04 2012Client IIrrigation of 4th Stage Malatya / Akçadağ Concrete Lined Primary Canal 16 km C...
-
Yaprak 2 Dam and Hydroelectric Power Plant
Feb,04 2012Client Nisan Energy Location Amasya Tasova Installed Capacity (MW) 11 Total Energy...
-
Malatya Akcadag Second Stage Irrigation
Feb,04 2012Client Irrigation of 2nd Stage Malatya / Akçadağ Concrete Lined Primary Canal 13 km Op...
-
Antalya Köprüçay Right Bank Irrigation
Feb,04 2012Client General Directorate of State Hydraulic Works Concrete Lined Primary Canal 10 km Operation...
-
Umut 3 Dam and Hydroelectric Power Plant
Feb,04 2012Client Nisan - Energy Location Ordu - Akkus Installed Capacity (MW) 12 MW Total En...
-
Basak Dam and Hydroelectric Power Plant
Feb,04 2012Client Nisan Energy Location Kurucasile - Bartin Installed Capacity (MW) 6.85 MW T...
-
Miscellaneous Highways, Bridges and Culverts Constructions
Feb,03 2012Name Miscellaneous Highways, Bridges and Culverts Constructions
-
Chiffa Algeria 750 Social Residence
Feb,03 2012Client Office de Promotion et Gestion Immobilier de Blida (OPGI Blida) Scope of Work At the...
-
Phase I-Central Region Water Supply to Hrawa and Wadi Al Ahmar Project
Feb,03 2012Client Great Socialist Peoples Libyan Arab Jamahiriya Investment Board HRAWA PROJECT 1-Pipe...
-
Construction of Tuna Dam and HEPP
Feb,03 2012Client Nisan Elektromekanik Enerji ve San. Tic. A.Ş. High of Dam 50 m Total Length of T...
-
About us
Jan,24 2012The Hikmet ATAMAN and Partner construction company was founded in 1962 as a partnership between Hikm...
The Hikmet ATAMAN and Partner construction company was founded in 1962 as a partnership between Hikmet ATAMAN and Hüseyin ÇALIK. The company reached it’s status as ATAÇ Hikmet ATAMAN and partners construction, Commerce and Industry Inc. in 1991 A last modification related with the name of the company was done in 1999 and the company registration was changed to Ataç Construction and Industry Co. Inc.
Field of Activities
During this time, ATAÇ CONSTRUCTION AND INDUSTRY Co. Inc. has gained deep expertise and good reputation in the fields of water structures such as:
Dams – Hydro Electric Power Plants – Diversion Tunnels – Irrigation Systems – Infrastructure Works – Waste Water Treatment Plants – Portable Water Treatment Plants
Besides its deep expertise in the hydraulic constructions, Ataç Construction and Industry has completed projects in the below listed fields too.
Housing Complexes – Industrial Plants such as Sugar&Textile Factories – Hotels and Holiday Villages – Natural Gas Distribution and Pipelines – Roads – Aerodromes